Floor plans, sections, elevation Roc's Comments: This was my first job. It was for Neva Goodwin who has remained a good friend ever since. The work began back in the 70's and was first a kitchen renovation with bay window addition. Bob Patterson who suggested me to Neva was cajoled into designing the beautiful garden in front. Neva and I worked well together and she truly enjoyed the new space when it was completed. Edgar Walls did the construction and Barb Sassaman helped with the drawings. We went on to do about 5 or six additional tasks for Neva there including moving and renovating the Jordan house across the road.
Description: Floor plans, sections, elevation Roc's Comments: This was my first job. It was for Neva Goodwin who has remained a good friend ever since. The work began back in the 70's and was first a kitchen renovation with bay window addition. Bob Patterson who suggested me to Neva was cajoled into designing the beautiful garden in front. Neva and I worked well together and she truly enjoyed the new space when it was completed. Edgar Walls did the construction and Barb Sassaman helped with the drawings. We went on to do about 5 or six additional tasks for Neva there including moving and renovating the Jordan house across the road. [show more]
Roc drawing for Robert Knight, Architect in Blue Hill foundation and framing plan, floor plans, details, elevations, kitchen, bath, schedules Roc's Comments: This is not a house I designed but it was done by my friend and former Yale Architecture classmate, Bob Knight. As I recall I was out of work and called Bob to see if he needed help and he asked me to do the construction drawings for this one. I was happy for the work. The final project was a great success and I am proud to have been associated with Bob.
Description: Roc drawing for Robert Knight, Architect in Blue Hill foundation and framing plan, floor plans, details, elevations, kitchen, bath, schedules Roc's Comments: This is not a house I designed but it was done by my friend and former Yale Architecture classmate, Bob Knight. As I recall I was out of work and called Bob to see if he needed help and he asked me to do the construction drawings for this one. I was happy for the work. The final project was a great success and I am proud to have been associated with Bob. [show more]
Survey, site plan, existing conditions, preliminary plan, new site plan, floor plan, elevations, sections, structural details, foundation plan, schedules (doors, windows, plumbing, appliances, int. finish, electrical plan and fixture schedule
Roc Caivano
1983
Gimpel Residence
Schooner Head Road
54 sheets
22 diazo, 21 mylar, 1 paper vellum, 9 tracing papers, 1 paper
site plan, floor plans, elevations, masonry heater details, sketches Roc Caivano, Danny Emory, Southwest Harbor Roc's comments: A great client and two generations of design. First when he was single and then expansion after he married.
Description: site plan, floor plans, elevations, masonry heater details, sketches Roc Caivano, Danny Emory, Southwest Harbor Roc's comments: A great client and two generations of design. First when he was single and then expansion after he married.
October 15, 1987 wall sections and details Roc's comments: We did an addition to the Thayer School of Engineering at Dartmouth when I was an associate at the firm of Venturi, Rauch and Scott Brown in Philadelphia. It was a pleasure and education working for Bob Venturi and John Rauch as the Project Manager on this project. The stock market took a dive when the bids were due and this project came in one million dollars under budget. The professors were delighted when we used the money to upgrade their laboratory equipment. This was the only class 1000 clean room I was involved with and I enjoyed doing the drawings of the entry structure and overseers room myself. Tom Fisher was the project manager for the very complicated construction phase and the Boston firm Payette Associates expert laboratory designers were our partners on this project. As complicated as anything I have ever done and a great preparation for the two hospital additions we did in later years. I liked this kind of complicated work. After this project the Venturi firm was asked to do two major projects for Dartmouth.
Description: October 15, 1987 wall sections and details Roc's comments: We did an addition to the Thayer School of Engineering at Dartmouth when I was an associate at the firm of Venturi, Rauch and Scott Brown in Philadelphia. It was a pleasure and education working for Bob Venturi and John Rauch as the Project Manager on this project. The stock market took a dive when the bids were due and this project came in one million dollars under budget. The professors were delighted when we used the money to upgrade their laboratory equipment. This was the only class 1000 clean room I was involved with and I enjoyed doing the drawings of the entry structure and overseers room myself. Tom Fisher was the project manager for the very complicated construction phase and the Boston firm Payette Associates expert laboratory designers were our partners on this project. As complicated as anything I have ever done and a great preparation for the two hospital additions we did in later years. I liked this kind of complicated work. After this project the Venturi firm was asked to do two major projects for Dartmouth. [show more]
site plan, floor plans, elevations, sections, construction details, electrical, mechanical. plumbing, heating, landscape photographs are of a 3-D model Roc's comments: Gates was the first project we did for COA when I was still in Philly working with Lyman Perry. We went to an interview and were chosen to design one single small dormitory/ home for something like 8-12 students. It was never built. But a few years later the college asked for the larger dorm that resulted in B/T.
Description: site plan, floor plans, elevations, sections, construction details, electrical, mechanical. plumbing, heating, landscape photographs are of a 3-D model Roc's comments: Gates was the first project we did for COA when I was still in Philly working with Lyman Perry. We went to an interview and were chosen to design one single small dormitory/ home for something like 8-12 students. It was never built. But a few years later the college asked for the larger dorm that resulted in B/T. [show more]