plan of existing conditions by: G. F. Johnston & Associates, Consulting Civil Engineers, PO BOX 197, Southwest Harbor, Maine 04679 floor plan, program analysis: medical assistant office perspective, exam room perspective, mechanical notes, south elevation sketches, drawings
Description: plan of existing conditions by: G. F. Johnston & Associates, Consulting Civil Engineers, PO BOX 197, Southwest Harbor, Maine 04679 floor plan, program analysis: medical assistant office perspective, exam room perspective, mechanical notes, south elevation sketches, drawings
Description: Foundation plan, floor plan, elevations, sections & details, plumbing & electrical, existing conditions, site layout, site grading, site details
Elevations and details, window/door schedule, foundation plan and details, floor plans, building sections, roof plan, sections and alley elevations, sketches, drawings, proposed sidewalk renovation
Description: Elevations and details, window/door schedule, foundation plan and details, floor plans, building sections, roof plan, sections and alley elevations, sketches, drawings, proposed sidewalk renovation
Description: Floor plans, basement plan, floor plan existing conditions, life safety code, wall section, space usage, floor plan and framing, sketches, drawings
Site plan, foundation plan, foundation details, floor plans, building sections, wall sections, stairs, elevator, window and door schedule, greenhouse and skylights, floors framing plan, roof framing plan, mechanical and plumbing plan, electrical plan, 1 booklet of drawings and notes (on recycled diazo paper)
Description: Site plan, foundation plan, foundation details, floor plans, building sections, wall sections, stairs, elevator, window and door schedule, greenhouse and skylights, floors framing plan, roof framing plan, mechanical and plumbing plan, electrical plan, 1 booklet of drawings and notes (on recycled diazo paper)
July 15, 1994 lobby floor plan, teller counter elevations, ATM entry elevation, sketches Roc's comment: Another well intentioned effort gone awry. Did some major redesign work for the Bar Harbor Bank in Bar Harbor with John Gordon as project manager. Sheldon Goldthwait was the president at the time who asked for our help. The bank board decided to go with the designer from their supply company and our plans were used but modified beyond recognition.
Description: July 15, 1994 lobby floor plan, teller counter elevations, ATM entry elevation, sketches Roc's comment: Another well intentioned effort gone awry. Did some major redesign work for the Bar Harbor Bank in Bar Harbor with John Gordon as project manager. Sheldon Goldthwait was the president at the time who asked for our help. The bank board decided to go with the designer from their supply company and our plans were used but modified beyond recognition. [show more]
Sketches, elevations, boundary/topographic plan, Roc's comment: Pro Bono work for the Bar Harbor YMCA. They used the drawings and concept to raise money then they hired a Lewiston Architect noted for designing salt sheds for the Maine DOT to do the project.
Roc Caivano
June-July 1992
Park Street, Bar Harbor
16 sheets
2 mylar, 3 papers, 9 tracing papers, 2 paper vellum
2 mylar, 3 papers, 9 tracing papers, 2 paper vellum
Condition:
great
Description: Sketches, elevations, boundary/topographic plan, Roc's comment: Pro Bono work for the Bar Harbor YMCA. They used the drawings and concept to raise money then they hired a Lewiston Architect noted for designing salt sheds for the Maine DOT to do the project.
Floor plans, elevations Roc's comment: Delightful old friend. Good poet. Wanted a small cottage next to here shore path shingle home for the family to live in while renting the old house.
Description: Floor plans, elevations Roc's comment: Delightful old friend. Good poet. Wanted a small cottage next to here shore path shingle home for the family to live in while renting the old house.