1 - 5 of 5 results
You searched for: Subject: is exactly 'Structures, Institutional, School'Date: 1980s
Refine Your Search
Refine Your Search
Subject
Type
  • Document
Place
Date
Item Title Type Subject Description Creator Date Property Name Street Pages Medium Condition
1312Schematic Design for College of the Atlantic Auditorium and Site Plan
  • Document, Projection, Architectural Drawing
  • Other, Land
  • Structures, Institutional, School
  • Structures, Other Structures
These are drawings of an Auditorium for College of the Atlantic. They are a good example of the extent of the COA campus and future plans in the early 80's. Stewart Brecher was hired to replace me as the teacher in Environmental design. He went to Judy Swazey, the president who had just replaced Ed Kaelber, and complained that I was still involved in the College. Judy decided to use nether of us for the design and hired Dan Sculley as their new architect for the project. There was a faculty member, Paul Dubois, who was an arsonist and Paul for unexplainable reasons burned down the original Campus building. Dan then designed the new Kaelber Hall- dining, library and classroom building and the College prospered from that point on. Long story. Toward the end of my work teaching and establishing a program in Environmental Design at College of the Atlantic I was asked to design a new auditorium for them. Sort of a swan song and thank you gift from the College. Harris Hyman and Barbara Sassaman and I did this. There were a number of alternative schemes presented and they settled on the one included here. There is a clever little 1/8th scale model with removable roof that goes along with these drawings. After I left the College, Stuart Brecher became the design teacher and complained to the new president of COA, Judy Swazey, that he should be the one to do the project. Judy took me to lunch and, while picking up the check, said she had decided to have neither of us do the project but put us on a committee to hire a third architect. Our committee hired Dan Sculley, an old friend, to do the new auditorium. Within the year Paul Dubois, a disgruntled COA teacher set the original Kaelber Hall on fire and it was totally destroyed. Sculley then did an excellent job designing a new Library/student center and Dining Hall in its place. By the time of its completion I was working in Philadelphia for the firm Venturi, Rauch, Scott-Brown and the college of the Atlantic decided to hire Turner Brooks (another friend and Yale classmate) to do a new Auditorium/Classroom building. When we returned to MDI in 1990 I was finally asked to do a project for COA, the reason we moved to MDI in the first place. The building we eventually completed was the Blair/ Tyson Dormitory. Sculley, Brooks and I sat within 2o feet of each other in graduate school and have been friend ever since. We went on to each do projects for Marlboro College in Vermont. The "three amigos" of New England architecture:)
  • Roc Caivano, Harris Hyman
  • 1981-1982
  • Eden Street
  • 48 sheets
  • 19 mylars, 6 diazo, 9 tracing papers, 14 paper vellum
  • good
Description:
These are drawings of an Auditorium for College of the Atlantic. They are a good example of the extent of the COA campus and future plans in the early 80's. Stewart Brecher was hired to replace me as the teacher in Environmental design. He went to Judy Swazey, the president who had just replaced Ed Kaelber, and complained that I was still involved in the College. Judy decided to use nether of us for the design and hired Dan Sculley as their new architect for the project. There was a faculty member, Paul Dubois, who was an arsonist and Paul for unexplainable reasons burned down the original Campus building. Dan then designed the new Kaelber Hall- dining, library and classroom building and the College prospered from that point on. Long story. Toward the end of my work teaching and establishing a program in Environmental Design at College of the Atlantic I was asked to design a new auditorium for them. Sort of a swan song and thank you gift from the College. Harris Hyman and Barbara Sassaman and I did this. There were a number of alternative schemes presented and they settled on the one included here. There is a clever little 1/8th scale model with removable roof that goes along with these drawings. After I left the College, Stuart Brecher became the design teacher and complained to the new president of COA, Judy Swazey, that he should be the one to do the project. Judy took me to lunch and, while picking up the check, said she had decided to have neither of us do the project but put us on a committee to hire a third architect. Our committee hired Dan Sculley, an old friend, to do the new auditorium. Within the year Paul Dubois, a disgruntled COA teacher set the original Kaelber Hall on fire and it was totally destroyed. Sculley then did an excellent job designing a new Library/student center and Dining Hall in its place. By the time of its completion I was working in Philadelphia for the firm Venturi, Rauch, Scott-Brown and the college of the Atlantic decided to hire Turner Brooks (another friend and Yale classmate) to do a new Auditorium/Classroom building. When we returned to MDI in 1990 I was finally asked to do a project for COA, the reason we moved to MDI in the first place. The building we eventually completed was the Blair/ Tyson Dormitory. Sculley, Brooks and I sat within 2o feet of each other in graduate school and have been friend ever since. We went on to each do projects for Marlboro College in Vermont. The "three amigos" of New England architecture:) [show more]
1231Gates Dormitory Unbuilt at College of the Atlantic
  • Document, Projection, Architectural Drawing
  • Structures, Dwellings, Dormitory
  • Structures, Institutional, School
site plan, floor plans, elevations, sections, construction details, electrical, mechanical. plumbing, heating, landscape photographs are of a 3-D model Roc's comments: Gates was the first project we did for COA when I was still in Philly working with Lyman Perry. We went to an interview and were chosen to design one single small dormitory/ home for something like 8-12 students. It was never built. But a few years later the college asked for the larger dorm that resulted in B/T.
  • Roc Caivano
  • 1989
  • Eden Street, Bar Harbor
  • 33 sheets
  • 33 diazo, 1 paper, 4 photographs
  • great
Description:
site plan, floor plans, elevations, sections, construction details, electrical, mechanical. plumbing, heating, landscape photographs are of a 3-D model Roc's comments: Gates was the first project we did for COA when I was still in Philly working with Lyman Perry. We went to an interview and were chosen to design one single small dormitory/ home for something like 8-12 students. It was never built. But a few years later the college asked for the larger dorm that resulted in B/T. [show more]
1292The Turrets at College of the Atlantic
  • Document, Projection, Architectural Drawing
  • Structures, Institutional, School
elevations, floor plans, site plans, details, sketches Roc's Comment: First renovation of the abandoned Turrets building at COA. 1979 thru 1981. Work done by students and faculty and a large selection of local sub-contractors. Design and construction managed by Roc, Harris and Sass. Dick Reinhardt and Roc went to Washington and received a grant with further assistance from the State to repair and re inhabit the building.
  • Roc Caivano, Harris Hyman, Barb Sassman
  • 1979-1981
  • The Turrets
  • Eden Street, Bar Harbor
  • 21 sheets
  • 8 mylar, 10 sepia, 3 paper
  • good
Description:
elevations, floor plans, site plans, details, sketches Roc's Comment: First renovation of the abandoned Turrets building at COA. 1979 thru 1981. Work done by students and faculty and a large selection of local sub-contractors. Design and construction managed by Roc, Harris and Sass. Dick Reinhardt and Roc went to Washington and received a grant with further assistance from the State to repair and re inhabit the building.
1328The Somesville Schoolhouse for Mr. Richard Fuerst
  • Document, Projection, Architectural Drawing
  • Structures, Institutional, School
floor plans, sections
  • Roc Caivano
  • 1980
  • Mount Desert
  • 8 sheets
  • 5 mylars, 3 diazo
  • great
Description:
floor plans, sections
1219Dartmouth College Additions and Renovations to the Thayer School of Engineering
  • Document, Projection, Architectural Drawing
  • Structures, Institutional, School
October 15, 1987 wall sections and details Roc's comments: We did an addition to the Thayer School of Engineering at Dartmouth when I was an associate at the firm of Venturi, Rauch and Scott Brown in Philadelphia. It was a pleasure and education working for Bob Venturi and John Rauch as the Project Manager on this project. The stock market took a dive when the bids were due and this project came in one million dollars under budget. The professors were delighted when we used the money to upgrade their laboratory equipment. This was the only class 1000 clean room I was involved with and I enjoyed doing the drawings of the entry structure and overseers room myself. Tom Fisher was the project manager for the very complicated construction phase and the Boston firm Payette Associates expert laboratory designers were our partners on this project. As complicated as anything I have ever done and a great preparation for the two hospital additions we did in later years. I liked this kind of complicated work. After this project the Venturi firm was asked to do two major projects for Dartmouth.
  • Roc Caivano
  • 1987
  • Hanover, NH
  • 5 sheets
  • 5 diazo
  • great
Description:
October 15, 1987 wall sections and details Roc's comments: We did an addition to the Thayer School of Engineering at Dartmouth when I was an associate at the firm of Venturi, Rauch and Scott Brown in Philadelphia. It was a pleasure and education working for Bob Venturi and John Rauch as the Project Manager on this project. The stock market took a dive when the bids were due and this project came in one million dollars under budget. The professors were delighted when we used the money to upgrade their laboratory equipment. This was the only class 1000 clean room I was involved with and I enjoyed doing the drawings of the entry structure and overseers room myself. Tom Fisher was the project manager for the very complicated construction phase and the Boston firm Payette Associates expert laboratory designers were our partners on this project. As complicated as anything I have ever done and a great preparation for the two hospital additions we did in later years. I liked this kind of complicated work. After this project the Venturi firm was asked to do two major projects for Dartmouth. [show more]